Report number: PD-20260502191550-129620-434710
- The Scout has completed only two Lion Electives. The dates for both appear correctly in the list under “Elective Adventures” on the bottom part of the report: 02/08/2026 and 03/08/2026. However, on the top part of the report under “Lion 2024 requirements”, both requirement 2a and 2b show the same date of 03/08/2026; one of those should be February and the other should be March.
- The overall completion date for requirement 2 is listed as 02/08/2026, which is the date the first elective was completed. It should be the date the second elective was completed.
- The overall completion date for requirement 1 is listed as 10/05/2025, which is the date the first required Adventure was completed. Requirement 1’s completion date should be 03/29/2026, which is the date the Scout completed the last two of the six required adventures.
The overall date for completing Lion is correctly showing as 03/29/2026, which is the date the last overall requirement (which in this case is requirement 1) was actually completed.