Saving a PLC in IA results in "Error Invalid eventType"

A PLC meeting was created in Scoutbook going from 6:30pm to 6:30pm. I tried to edit it in IA to make it end at 8:00pm and I got “Error Invalid eventType”.

Worked fine for me - did you save and then edit and got the error?

It was created by someone else awhile back in Scoutbook.

I tried a couple of times today, no luck. Did incognito and hard-refresh, no luck.

I got it to work by setting the meeting type again to PLC (no change other than the date). Basically, if IA is saying bad type, let’s let it set the type. It saved.

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.