Startdate error

I had an event created in SB+, but when I tried to record the activities for the event, I now keep getting an error that reads Error startDate should be greater than or equal to today - startDate:2024-08-17T02:00:00
Even if I don’t make changes, select edit the event, and then try to save, I get the error. I have tried changing the date of the event to see if that helped—it doesn’t.
I notice that when I try to create the activity log, I get the error, but it saves, although with incorrect information (Scouts that I was trying to remove from the event are showing up because I can’t remove them from the event in the calendar. If I try to edit the activity or link it to the event, I get the startDate error again.

1 Like

@WynterDait this is a known reported issue - watch change logs for updates

1 Like

Thank you - where in Change Logs do I look for an update on this? I did see this as a topic, but then someone told the person to check the change logs for updates.

@WynterDait

We recommend subscribing to Scoutbook - Scoutbook Plus Change Log - Scouting Forums so you get an e-mail whenever we post a new change log. Go to the Change log, click the bell icon in the upper right then select Watching or Watching First Post. Since we do not allow anyone to reply to the change logs, these options are equivalent.

1 Like

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.