New CC here and it looks like I messed something up when advancing my dens for the new year.

I advanced all of the dens to the next rank before all of their adventures from last year were entered as completed. When I revert the Lion den back to the previous rank, all of the adventures listed are still the 2024 versions. Is there a way to approve the 2023 adventures, which had been completed? I was able to do this for the other ranks, but not Lion.

@ChristopherRatto - there is no den/rank before lion so what could you move them back to ? Was it that the lion den was advanced to tiger then brought back to lion. You would need to change the RANK version to the prior year for each scout not the adventure.

@ChristopherRatto When you go from Tiger back to Lion - where the Rank says 2024 - you can change it back to the old year in a drop down there. you have to use a date of 8/30/24 or before.

@DonovanMcNeil This worked! Thank you so much.